Skip to content

Weather / NWP

PV depends on future radiation and clouds. Historical benchmarking must use a weather forecast vintage eligible before the PV issue time.

historical NWP run -> availability policy -> latest complete eligible vintage
                                                      |
                                           future weather covariates
                                                      |
                                                 PV forecaster

Future observed weather and reanalysis cannot replace historical forecast weather.

The implemented source is operational NOAA/NCEP GFS 0.25° via NODD. It preserves run identity and radiation bounds, aligns surface DSWRF interval averages, entire-atmosphere TCDC and 2m temperature, and aggregates a 209-cell Belgian subset with pinned area weights.

Init plus six hours is an availability approximation, not certified historical evidence. Retrieval time is not original availability. Selection requires a complete eligible vintage. Models receive numerical covariates, never GRIB. Missing required NWP fails the whole origin with accounting.

Preparation needs optional tooling and local archives; the quickstart does not. See the weather contract, Weather-LightGBM and development comparison.